All your favorite posts, one swipe away
Omg I forgot I saw this lmao 😭😭 this is beautiful
I remembered that audio and had to rush the idea out while I work on smth else
THAT ARE SO SILLY AUUUGGHHHH
rocket scienc erhthfg
ALT: This video shows blades of grass moving in the wind on a beautiful day at NASA’s Michoud Assembly Facility in New Orleans. In the background, we see the 212-foot-core stage for the powerful SLS (Space Launch System) rocket used for Artemis I. The camera ascends, revealing the core stage next to a shimmering body of water as technicians lead it towards NASA’s Pegasus barge. Credit: NASA
Technicians with NASA and SLS core stage lead contractor Boeing, along with RS-25 engines lead contractor Aerojet Rocketdyne, an L3Harris Technologies company, are nearing a major milestone for the Artemis II mission. The SLS (Space Launch System) rocket’s core stage for Artemis II is fully assembled and will soon be shipped via barge from NASA’s Michoud Assembly Facility in New Orleans to the agency’s Kennedy Space Center in Florida. Once there, it will be prepped for stacking and launch activities.
Get to know the core stage – by the numbers.
Standing 212 feet tall and measuring 27.6 feet in diameter, the SLS core stage is the largest rocket stage NASA has ever built. Due to its size, the hardware must be shipped aboard NASA’s Pegasus barge.
Once loaded, the barge – which was updated to accommodate the giant core stage -- will travel 900 miles to Florida across inland and ocean waterways. Once at Kennedy, teams with our Exploration Ground Systems team will complete checkouts for the core stage prior to stacking preparations.
As impressive as the core stage is on the outside, it’s also incredible on the inside. The “brains” of the rocket consist of three flight computers and special avionics systems that tell the rocket what to do. This is linked to 18 miles of cabling and more than 500 sensors and systems to help feed fuel and steer the four RS-25 engines.
Speaking of engines… Our SLS Moon rocket generates approximately 8.8 million pounds of thrust at launch. Two million pounds come from the four powerful RS-25 engines at the base of the core stage, while each of the two solid rocket boosters produces a maximum thrust of 3.6 million pounds. Together, the engines and boosters will help launch a crew of four Artemis astronauts inside NASA’s Orion spacecraft beyond Earth orbit to venture around the Moon.
Achieving the powerful thrust required at launch calls for a large amount of fuel - 733,000 gallons, to be precise. The stage has two huge propellant tanks that hold the super-cooled liquid hydrogen and liquid oxygen that make the rocket “go.” A new liquid hydrogen storage sphere has recently been built at Kennedy, which can store 1.25 million gallons of liquid hydrogen.
The number four doesn’t just apply to the RS-25 engines. It’s also the number of astronauts who will fly inside our Orion spacecraft atop our SLS rocket for the first crewed Artemis mission. When NASA astronauts Reid Wiseman, Christina Koch, and Victor Glover along with CSA astronaut Jeremy Hansen launch, they will be the first astronauts returning to the Moon in more than 50 years.
Make sure to follow us on Tumblr for your regular dose of space!
When our Space Launch System (SLS) rocket launches the Artemis missions to the Moon, it can have a top speed of more than six miles per second. Rockets and racecars are designed with speed in mind to accomplish their missions—but there’s more to speed than just engines and fuel. Learn more about the physics of going fast:
Take a look under the hood, so to speak, of our SLS mega Moon rocket and you’ll find that each of its four RS-25 engines have high-pressure turbopumps that generate a combined 94,400 horsepower per engine. All that horsepower creates more than 2 million pounds of thrust to help launch our four Artemis astronauts inside the Orion spacecraft beyond Earth orbit and onward to the Moon. How does that horsepower compare to a racecar? World champion racecars can generate more than 1,000 horsepower as they speed around the track.
As these vehicles start their engines, a series of special machinery is moving and grooving inside those engines. Turbo engines in racecars work at up to 15,000 rotations per minute, aka rpm. The turbopumps on the RS-25 engines rotate at a staggering 37,000 rpm. SLS’s RS-25 engines will burn for approximately eight minutes, while racecar engines generally run for 1 ½-3 hours during a race.
To use that power effectively, both rockets and racecars are designed to slice through the air as efficiently as possible.
While rockets want to eliminate as much drag as possible, racecars carefully use the air they’re slicing through to keep them pinned to the track and speed around corners faster. This phenomenon is called downforce.
Steering these mighty machines is a delicate process that involves complex mechanics.
Most racecars use a rack-and-pinion system to convert the turn of a steering wheel to precisely point the front tires in the right direction. While SLS doesn’t have a steering wheel, its powerful engines and solid rocket boosters do have nozzles that gimbal, or move, to better direct the force of the thrust during launch and flight.
Racecar drivers and astronauts are laser focused, keeping their sights set on the destination. Pit crews and launch control teams both analyze data from numerous sensors and computers to guide them to the finish line. In the case of our mighty SLS rocket, its 212-foot-tall core stage has nearly 1,000 sensors to help fly, track, and guide the rocket on the right trajectory and at the right speed. That same data is relayed to launch teams on the ground in real time. Like SLS, world-champion racecars use hundreds of sensors to help drivers and teams manage the race and perform at peak levels.
Knowing how to best use, manage, and battle the physics of going fast, is critical in that final lap. You can learn more about rockets and racecars here.
Make sure to follow us on Tumblr for your regular dose of space!
NASA’s Space Launch System (SLS) rocket is on the launch pad at NASA’s Kennedy Space Center in Florida and in final preparations for the Artemis I mission to the Moon. Now that our Moon rocket is almost ready for its debut flight, we wanted to take a look back at some of the most liked photographs of our SLS rocket coming together over the years.
We asked NASA photographers to share their favorite photos of the SLS rocket for Artemis I at different phases of testing, manufacturing, and assembly. Here are their stories behind the photos:
“On this day in March 2018, crews at NASA’s Marshall Space Flight Center in Huntsville, Alabama, transported the intertank structural test article off NASA’s Pegasus barge to the Load Test Annex test facility for qualification testing.” —Emmett Given, photographer, NASA’s Marshall Space Flight Center
“This is the liquid oxygen tank structural test article as it was moved from the Pegasus barge to the West Test Area at our Marshall Space Flight Center on July 9, 2019. The tank, which is structurally identical to its flight version, was subsequently placed in the test stand for structural testing several days later. I remember it being a blazing hot day!” —Fred Deaton, photographer, NASA’s Marshall Space Flight Center
“The large components of the SLS rocket’s core stage can make you forget that there are many hands-on tasks required to assemble a rocket, too. During the mating of the liquid hydrogen tank to the forward section of the rocket’s 212-foot-tall core stage in May 2019, technicians fastened 360 bolts to the circumference of the rocket. Images like this remind me of all the small parts that have to be installed with care, expertise, and precision to create one huge Moon rocket. Getting in close to capture the teammates that work tirelessly to make Artemis a success is one of the best parts of my job.” —Eric Bordelon, photographer, NASA’s Michoud Assembly Facility
“An incredible amount of precision goes into building a rocket, including making sure that each of our SLS rocket’s four RS-25 engines is aligned and integrated into the core stage correctly. In this image from October 2019, I attempted to illustrate the teamwork and communication happening as technicians at NASA’s Michoud Assembly Facility in New Orleans do their part to help land the first woman and the first person of color on the Moon through the Artemis missions. It’s rare to see the inside of a rocket – not as much for the NASA and Boeing engineers who manufacture and assemble a rocket stage!” —Jared Lyons, photographer, NASA’s Michoud Assembly Facility
“When the fully assembled and completed core stage left the Michoud factory in January 2020, employees took a “family photo” to mark the moment. Crews transported the flight hardware to NASA’s Pegasus barge on Jan. 8 in preparation for the core stage Green Run test series at NASA’s Stennis Space Center near Bay St. Louis, Mississippi. When I look at this photo, I am reminded of all of the hard work and countless hours the Michoud team put forth to build this next-generation Moon rocket. I am honored to be part of this family and to photograph historic moments like this for the Artemis program.” —Steven Seipel, MAF multimedia team lead, NASA’s Michoud Assembly Facility
“This photo shows workers at Stennis prepare to lift the SLS core stage into the B-2 Test Stand for the SLS Green Run test series in the early morning hours of Jan. 22, 2020. I started shooting the lift operation around midnight. During a break in the action at about 5:30 a.m., I was driving my government vehicle to the SSC gas station to fuel up, when I saw the first light breaking in the East and knew it was going to be a nice sunrise. I turned around and hurried back to the test stand, sweating that I might run out of gas. Luckily, I didn’t run out and was lucky enough to catch a beautiful Mississippi sunrise in the background, too.” —Danny Nowlin, photographer, NASA’s Stennis Space Center
“I like the symmetry in the video as it pushes toward the launch vehicle stage adapter. Teams at NASA’s Marshall Space Flight Center in Huntsville, Alabama, loaded the cone-shaped piece of flight hardware onto our Pegasus barge in July 2020 for delivery to NASA’s Kennedy Space Center in Florida. The one-point perspective puts the launch vehicle stage adapter at the center of attention, but, if you pay attention to the edges, you can see people working. It gives a sense of scale. This was the first time I got to walk around Pegasus and meet the crew that transport the deep space rocket hardware, too.” —Sam Lott, videographer, SLS Program at Marshall Space Flight Center
“This was my first time photographing a test at our Stennis Space Center, and I wasn't sure what to expect. I have photographed big events like professional football games, but I wasn't prepared for the awesome power unleashed by the Space Launch System’s core stage and four RS-25 engines during the Green Run hot fire test. Watching the sound wave ripple across the tall grass toward us, feeling the shock wave of ignition throughout my whole body, seeing the smoke curling up into the blue sky with rainbows hanging from the plume; all of it was as unforgettable as watching a football player hoist a trophy into the air.” —Michael DeMocker, photographer, NASA’s Michoud Assembly Facility
“When our SLS Moon rocket launches the agency’s Artemis I mission to the Moon, 10 CubeSats, or small satellites, are hitching a ride inside the rocket’s Orion stage adapter (OSA). BioSentinel is one of those CubeSats. BioSentinel’s microfluidics card, designed at NASA’s Ames Research Center in California’s Silicon Valley, will be used to study the impact of interplanetary space radiation on yeast. To me, this photo is a great combination of the scientific importance of Artemis I and the human touch of more than 100 engineers and scientists who have dedicated themselves to the mission over the years.” —Dominic Hart, photographer, NASA’s Ames Research Center
“I was in the employee viewing area at Kennedy when the integrated SLS rocket and Orion spacecraft was rolled out to the launchpad for its wet dress rehearsal in March 2022. I really like this photo because the sun is shining on Artemis I like a spotlight. The giant doors of the Vehicle Assembly Building are the red curtain that opened up the stage -- and the spotlight is striking the SLS because it’s the star of the show making its way to the launchpad. I remember thinking how cool that NASA Worm logo looked as well, so I wanted to capture that. It was so big that I had to turn my camera sideways because the lens I had wasn’t big enough to capture the whole thing.” —Brandon Hancock, videographer, SLS Program at NASA’s Marshall Space Flight Center
“I made this image while SLS and Orion atop the mobile launcher were nearing the end of their four-mile trek to the pad on crawler-transporter 2 ahead of launch. Small groups of employees were filtering in and out of the parking lot by the pad gate to take in the sight of the rocket’s arrival. The “We Are Going!” banner affixed to the gate in the foreground bears the handwritten names of agency employees and contractors who have worked to get the rocket and spacecraft ready for the Artemis I flight test. As we enter the final days before launch, I am proud to have made my small contribution to documenting the historic rollout for this launch to the Moon.” —Joel Kowsky, photographer, NASA Headquarters
NASA photographers will be on the ground covering the Artemis I launch. As they do, we’ll continue to share their photos on our official NASA channels.
Make sure to follow us on Tumblr for your regular dose of space!
Our Space Launch System (SLS) rocket is coming together at the agency’s Kennedy Space Center in Florida this summer. Our mighty SLS rocket is set to power the Artemis I mission to send our Orion spacecraft around the Moon. But, before it heads to the Moon, NASA puts it together right here on Earth.
Read on for more on how our Moon rocket for Artemis I will come together this summer:
How do crews assemble a rocket and spacecraft as tall as a skyscraper? The process all starts inside the iconic Vehicle Assembly Building at Kennedy with the mobile launcher. Recognized as a Florida Space Coast landmark, the Vehicle Assembly Building, or VAB, houses special cranes, lifts, and equipment to move and connect the spaceflight hardware together. Orion and all five of the major parts of the Artemis I rocket are already at Kennedy in preparation for launch. Inside the VAB, teams carefully stack and connect the elements to the mobile launcher, which serves as a platform for assembly and, later, for fueling and launching the rocket.
Because they carry the entire weight of the rocket and spacecraft, the twin solid rocket boosters for our SLS rocket are the first elements to be stacked on the mobile launcher inside the VAB. Crews with NASA’s Exploration Ground Systems and contractor Jacobs team completed stacking the boosters in March. Each taller than the Statue of Liberty and adorned with the iconic NASA “worm” logo, the five-segment boosters flank either side of the rocket’s core stage and upper stage. At launch, each booster produces more than 3.6 million pounds of thrust in just two minutes to quickly lift the rocket and spacecraft off the pad and to space.
In between the twin solid rocket boosters is the core stage. The stage has two huge liquid propellant tanks, computers that control the rocket’s flight, and four RS-25 engines. Weighing more than 188,000 pounds without fuel and standing 212 feet, the core stage is the largest element of the SLS rocket. To place the core stage in between the two boosters, teams will use a heavy-lift crane to raise and lower the stage into place on the mobile launcher.
On launch day, the core stage’s RS-25 engines produce more than 2 million pounds of thrust and ignite just before the boosters. Together, the boosters and engines produce 8.8 million pounds of thrust to send the SLS and Orion into orbit.
Once the boosters and core stage are secured, teams add the launch vehicle stage adapter, or LVSA, to the stack. The LVSA is a cone-shaped element that connects the rocket’s core stage and Interim Cryogenic Propulsion Stage (ICPS), or upper stage. The roughly 30-foot LVSA houses and protects the RL10 engine that powers the ICPS. Once teams bolt the LVSA into place on top of the rocket, the diameter of SLS will officially change from a wide base to a more narrow point — much like a change in the shape of a pencil from eraser to point.
Next in the stacking line-up is the Interim Cryogenic Propulsion Stage or ICPS. Like the LVSA, crews will lift and bolt the ICPS into place. To help power our deep space missions and goals, our SLS rocket delivers propulsion in phases. At liftoff, the core stage and solid rocket boosters will propel Artemis I off the launch pad. Once in orbit, the ICPS and its single RL10 engine will provide nearly 25,000 pounds of thrust to send our Orion spacecraft on a precise trajectory to the Moon.
When the Orion stage adapter crowns the top of the ICPS, you’ll know we’re nearly complete with stacking SLS rocket for Artemis I. The Orion Stage Adapter is more than just a connection point. At five feet in height, the Orion stage adapter may be small, but it holds and carries several small satellites called CubeSats. After Orion separates from the SLS rocket and heads to the Moon, these shoebox-sized payloads are released into space for their own missions to conduct science and technology research vital to deep space exploration. Compared to the rest of the rocket and spacecraft, the Orion stage adapter is the smallest SLS component that’s stacked for Artemis I.
Finally, our Orion spacecraft will be placed on top of our Moon rocket inside the VAB. The final piece will be easy to spot as teams recently added the bright red NASA “worm” logotype to the outside of the spacecraft. The Orion spacecraft is much more than just a capsule built to carry crew. It has a launch abort system, which will carry the crew to safety in case of an emergency, and a service module developed by the European Space Agency that will power and propel the spacecraft during its three-week mission. On the uncrewed Artemis I mission, Orion will check out the spacecraft’s critical systems, including navigation, communications systems, and the heat shield needed to support astronauts who will fly on Artemis II and beyond.
The path to the pad requires many steps and check lists. Before Artemis I rolls to the launch pad, teams will finalize outfitting and other important assembly work inside the VAB. Once assembled, the integrated SLS rocket and Orion will undergo several final tests and checkouts in the VAB and on the launch pad before it’s readied for launch.
The Artemis I mission is the first in a series of increasingly complex missions that will pave the way for landing the first woman and the first person of color on the Moon. The Space Launch System is the only rocket that can send NASA astronauts aboard NASA’s Orion spacecraft and supplies to the Moon in a single mission.
Make sure to follow us on Tumblr for your regular dose of space!
The past couple of weeks have been packed with milestones for our Artemis program — the program that will land the first woman and the next man on the Moon!
Artemis I will be an integrated, uncrewed test of the Orion spacecraft and Space Launch System (SLS) rocket before we send crewed flights to the Moon.
On March 2, 2021, we completed stacking the twin SLS solid rocket boosters for the Artemis I mission. Over several weeks, workers with NASA's Exploration Ground Systems used one of five massive cranes to place 10 booster segments and nose assemblies on the mobile launcher inside the Vehicle Assembly Building at the Kennedy Space Center (KSC) in Florida.
On March 18, 2021, we completed our Green Run hot fire test for the SLS core stage at Stennis Space Center in Mississippi. The core stage includes the flight computers, four RS-25 engines, and enormous propellant tanks that hold more than 700,000 gallons of super cold propellant. The test successfully ignited the core stage and produced 1.6 million pounds of thrust. The next time the core stage lights up will be when Artemis I launches on its mission to the Moon!
In coming days, engineers will examine the data and determine if the stage is ready to be refurbished, prepared for shipment, and delivered to KSC where it will be integrated with the twin solid rocket boosters and the other rocket elements.
We are a couple steps closer to landing boots on the Moon!
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com
We continue to make progress toward the first launch of our Space Launch System (SLS) rocket for the Artemis I mission around the Moon. Engineers at NASA’s Stennis Space Center near Bay St. Louis, Mississippi are preparing for the last two tests of the eight-part SLS core stage Green Run test series.
The test campaign is one of the final milestones before our SLS rocket launches America’s Orion spacecraft to the Moon with the Artemis program. The SLS Green Run test campaign is a series of eight different tests designed to bring the entire rocket stage to life for the first time.
As our engineers and technicians prepare for the wet dress rehearsal and the SLS Green Run hot fire, here are some numbers to keep in mind:
The SLS rocket’s core stage is the largest rocket stage we have ever produced. From top to bottom of its four RS-25 engines, the rocket stage measures 212 feet.
For each of the Green Run tests, the SLS core stage is installed in the historic B-2 Test Stand at Stennis. The test stand was updated to accommodate the SLS rocket stage and is 35 stories tall – or almost 350 feet!
All four RS-25 engines will operate simultaneously during the final Green Run Hot Fire. Fueled by the two propellant tanks, the cluster of engines will gimbal, or pivot, and fire for up to eight minutes just as if it were an actual Artemis launch to the Moon.
Our brawny SLS core stage is outfitted with three flight computers and special avionics systems that act as the “brains” of the rocket. It has 18 miles of cabling and more than 500 sensors and systems to help feed fuel and direct the four RS-25 engines.
The stage has two huge propellant tanks that collectively hold 733,000 gallons of super-cooled liquid hydrogen and liquid oxygen. The stage weighs more than 2.3 million pounds when its fully fueled.
It’ll take 114 trucks – 54 trucks carrying liquid hydrogen and 60 trucks carrying liquid oxygen – to provide fuel to the SLS core stage.
A series of barges will deliver the propellant from the trucks to the rocket stage installed in the test stand. Altogether, six propellant barges will send fuel through a special feed system and lines. The propellant initially will be used to chill the feed system and lines to the correct cryogenic temperature. The propellant then will flow from the barges to the B-2 Test Stand and on into the stage’s tanks.
All eight of the Green Run tests and check outs will produce more than 100 terabytes of collected data that engineers will use to certify the core stage design and help verify the stage is ready for launch.
For comparison, just one terabyte is the equivalent to 500 hours of movies, 200,000 five-minute songs, or 310,000 pictures!
The B-2 Test Stand has a flame deflector that will direct the fire produced from the rocket’s engines away from the stage. Nearly 33,000 tiny, handmade holes dot the flame deflector. Why? All those minuscule holes play a huge role by directing constant streams of pressurized water to cool the hot engine exhaust.
When NASA conducts the SLS Green Run Hot Fire test at Stennis, it’ll be the first time that the SLS core stage operates just as it would on the launch pad. This test is just a preview of what’s to come for Artemis I!
The Space Launch System is the only rocket that can send NASA astronauts aboard NASA’s Orion spacecraft and supplies to the Moon in a single mission. The SLS core stage is a key part of the rocket that will send the first woman and the next man to the Moon through NASA’s Artemis program.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com
The comprehensive test series called Green Run for our Space Launch System (SLS) rocket is underway at Stennis Space Center in Mississippi.
During Green Run, the rocket’s massive, 212-foot-tall core stage — the same flight hardware that will help launch Artemis I to the Moon – will operate together for the first time.
Here’s what you need to know about this top-to-bottom test series of our megarocket’s huge core:
Why is it called Green Run? “Green” refers to the new, untested hardware (AKA the core stage), and “run” represents the succession of tests the core stage paces through. One by one, this series will bring together several “firsts” for the rocket stage as the flight hardware undergoes eight different tests. Each test is designed to gradually bring our rocket’s core stage and all its systems to life for the first time.
So far, engineers have completed three of the series: the modal test, the avionics power-on, and the safety systems checkout. The safety systems are designed to end the test and shutdown systems automatically under undesirable conditions.
You can follow the progress of Green Run with this Green Run checklist infographic. Our team will be updating in real time as each Green Run test is completed.
The world’s tallest rocket stage is tested in an equally giant test stand. We upgraded the B-2 Test Stand used for the Saturn V rocket stages during the Apollo Program and, later, for the Space Shuttle Program. Now, the B-2 Test Stand is customized for testing our SLS core stage. When all four core stage engines fire up, they can generate some serious heat. So, the B-2 Test Stand will use roughly 100,000 gallons of water every 18 seconds to protect the stand and the hardware.
Speaking of engines firing up, the core stage will really show what it is capable of during the grand finale of Green Run. The goal is for the entire core stage to operate as one for up to 8.5 minutes — and that includes an impressive firing of all four RS-25 engines simultaneously. Just like at launch, more than 733,000 gallons of liquid propellant will flow from the two propellant tanks through the fuel lines to feed the RS-25 engines. When operating at sea level on the test stand, the cluster of four RS-25 engines will produce just over 1.6 million pounds of thrust – the same amount it will produce during the early phase of launch. During ascent, the core stage will produce a maximum thrust of over 2 million pounds.
All the Green Run tests, check outs and the 100 terabytes of collected data certify the core stage design and help verify the stage is ready for launch. To put the sheer amount of data collected during Green Run into perspective, just one terabyte is the equivalent of roughly 500 hours of movies. Even the Library of Congress’s collection only amounts to a total of 15 terabytes!
The next time our SLS rocket’s core stage fires up will be on the launch pad at Kennedy Space Center for the debut of the Artemis program. This inaugural SLS flight will be just the beginning of increasingly complex missions that will enable human exploration to the Moon and, ultimately, Mars.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com
Using a sustainable architecture and sophisticated hardware unlike any other, the first woman and the next man will set foot on the surface of the Moon by 2024. Artemis I, the first mission of our powerful Space Launch System (SLS) rocket and Orion spacecraft, is an important step in reaching that goal.
As we close out 2019 and look forward to 2020, here’s where we stand in the Artemis story — and what to expect in 2020.
The Artemis I Orion spacecraft arrived at our Plum Brook Station in Sandusky, Ohio, on Tuesday, Nov. 26 for in-space environmental testing in preparation for Artemis I.
This four-month test campaign will subject the spacecraft, consisting of its crew module and European-built service module, to the vacuum, extreme temperatures (ranging from -250° to 300° F) and electromagnetic environment it will experience during the three-week journey around the Moon and back. The goal of testing is to confirm the spacecraft’s components and systems work properly under in-space conditions, while gathering data to ensure the spacecraft is fit for all subsequent Artemis missions to the Moon and beyond. This is the final critical step before the spacecraft is ready to be joined with the Space Launch System rocket for this first test flight in 2020!
On Dec. 9, we welcomed members of the public to our Michoud Assembly Facility in New Orleans for #Artemis Day and to get an up-close look at the hardware that will help power our Artemis missions. The 43-acre facility has more than enough room for guests and the Artemis I, II, and III rocket hardware! NASA Administrator Jim Bridenstine formally unveiled the fully assembled core stage of our SLS rocket for the first Artemis mission to the Moon, then guests toured of the facility to see flight hardware for Artemis II and III. The full-day event — complete with two panel discussions and an exhibit hall — marked a milestone moment as we prepare for an exciting next phase in 2020.
Once engineers and technicians at Michoud complete functional testing on the Artemis I core stage, it will be rolled out of the Michoud factory and loaded onto our Pegasus barge for a very special delivery indeed. About this time last year, our Pegasus barge crew was delivering a test version of the liquid hydrogen tank from Michoud to NASA’s Marshall Space Flight Center in Huntsville for structural testing. This season, the Pegasus team will be transporting a much larger piece of hardware — the entire core stage — on a slightly shorter journey to the agency’s nearby Stennis Space Center near Bay St. Louis, Mississippi.
Why Stennis, you ask? The giant core stage will be locked and loaded into the B2 Test Stand there for the landmark Green Run test series. During the test series, the entire stage, including its extensive avionics and flight software systems, will be tested in full. The series will culminate with a hot fire of all four RS-25 engines and will certify the complex stage “go for launch.” The next time the core stage and its four engines fire as one will be on the launchpad at NASA’s Kennedy Space Center in Florida.
As Orion and SLS make progress toward the pad for Artemis I, employees at NASA centers and large and small companies across America are hard at work assembling and manufacturing flight hardware for Artemis II and beyond. The second mission of SLS and Orion will be a test flight with astronauts aboard that will go around the Moon before returning home. Our work today will pave the way for a new generation of moonwalkers and Artemis explorers.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com.
It will take incredible power to send the first woman and the next man to the Moon’s South Pole by 2024. That’s where America’s Space Launch System (SLS) rocket comes in to play.
Providing more payload mass, volume capability and energy to speed missions through deep space than any other rocket, our SLS rocket, along with our lunar Gateway and Orion spacecraft, creates the backbone for our deep space exploration and Artemis lunar mission goals.
Here’s why our SLS rocket is a deep space rocket like no other:
The Artemis missions will send humans 280,000 miles away from Earth. That’s 1,000 times farther into space than the International Space Station. To accomplish that mega feat, you need a rocket that’s designed to lift — and lift heavy. With help from a dynamic core stage — the largest stage we have ever built — the 5.75-million-pound SLS rocket can propel itself off the Earth. This includes the 57,000 pounds of cargo that will go to the Moon. To accomplish this, SLS will produce 15% more thrust at launch and during ascent than the Saturn V did for the Apollo Program.
Where do our rocket’s lift and thrust capabilities come from? If you take a peek under our powerful rocket’s hood, so to speak, you’ll find a core stage with four RS-25 engines that produce more than 2 million pounds of thrust alongside two solid rocket boosters that each provide another 3.6 million pounds of thrust power. It’s a bold design. Together, they provide an incredible 8.8 million pounds of thrust to power the Artemis missions off the Earth. The engines and boosters are modified heritage hardware from the Space Shuttle Program, ensuring high performance and reliability to drive our deep space missions.
While our rocket’s core stage design will remain basically the same for each of the Artemis missions, the SLS rocket’s upper stage evolves to open new possibilities for payloads and even robotic scientific missions to worlds farther away than the Moon like Mars, Saturn and Jupiter. For the first three Artemis missions, our SLS rocket uses an interim cryogenic propulsion stage with one RL10 engine to send Orion to the lunar south pole. For Artemis missions following the initial 2024 Moon landing, our SLS rocket will have an exploration upper stage with bigger fuel tanks and four RL10 engines so that Orion, up to four astronauts and larger cargoes can be sent to the Moon, too. Additional core stages and upper stages will support either crewed Artemis missions, science missions or cargo missions for a sustained presence in deep space.
Crews at our Michoud Assembly Facility in New Orleans are in the final phases of assembling the core stage for Artemis I— and are already working on assembly for Artemis II.
Through the Artemis program, we aim not just to return humans to the Moon, but to create a sustainable presence there as well. While there, astronauts will learn to use the Moon’s natural resources and harness our newfound knowledge to prepare for the horizon goal: humans on Mars.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com
What does actually launching into space feel like?
Hi!! I’m a high school sophomore and I love the work NASA does! I’ve always wondered, what’s an astronaut’s first thought when leaving earth? What kind of experiences do you leave the expedition with? Thanks! :) - Lauren
The Vehicle Assembly Building, or VAB, at our Kennedy Space Center in Florida, is the only facility where assembly of a rocket occurred that carried humans beyond low-Earth orbit and on to the Moon. For 30 years, its facilities and assets were used during the Space Shuttle Program and are now available to commercial partners as part of our agency’s plan in support of a multi-user spaceport. To celebrate the VAB’s continued contribution to humanity’s space exploration endeavors, we’ve put together five out-of-this-world facts for you!
Aerial view of the Vehicle Assembly Building with a mobile launch tower atop a crawler transporter approaching the building.
An Apollo/Saturn V facilities Test Vehicle and Launch Umbilical Tower (LUT) atop a crawler-transporter move from the Vehicle Assembly Building (VAB) on the way to Pad A on May 25, 1966.
Workers painting the Flag on the Vehicle Assembly Building on January 2, 2007.
A mobile launcher, atop crawler-transporter 2, begins the move into High Bay 3 at the Vehicle Assembly Building (VAB) on Sept. 8, 2018.
A model of Northrop Grumman’s OmegA launch vehicle is flanked by the U.S. flag and a flag bearing the OmegA logo during a ribbon-cutting ceremony Aug. 16 in High Bay 2 of the Vehicle Assembly Building.
Whether the rockets and spacecraft are going into Earth orbit or being sent into deep space, the VAB will have the infrastructure to prepare them for their missions.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com.
Our Space Launch System rocket is on the move this summer — literally. With the help of big and small businesses in all 50 states, various pieces of hardware are making their way to Louisiana for manufacturing, to Alabama for testing, and to Florida for final assembly. All of that work brings us closer to the launch of Artemis 1, SLS and Orion’s first mission to the Moon.
The SLS rocket will feature the largest core stage we have ever built before. It’s so large, in fact, that we had to modify and refurbish our barge Pegasus to accommodate the massive load. Pegasus was originally designed to transport the giant external tanks of the space shuttles on the 900-mile journey from our rocket factory, Michoud Assembly Facility, in New Orleans to Kennedy Space Center in Florida. Now, our barge ferries test articles from Michoud along the river to Huntsville, Alabama, for testing at Marshall Space Flight Center. Just a week ago, the last of four structural test articles — the liquid oxygen tank — was loaded onto Pegasus to be delivered at Marshall for testing. Once testing is completed and the flight hardware is cleared for launch, Pegasus will again go to work — this time transporting the flight hardware along the Gulf Coast from New Orleans to Cape Canaveral.
The massive, five-segment solid rocket boosters each weigh 1.6 million pounds. That’s the size of four blue whales! The only way to move the components for the powerful boosters on SLS from Promontory, Utah, to the Booster Fabrication Facility and Vehicle Assembly Building at Kennedy is by railway. That’s why you’ll find railway tracks leading from these assembly buildings and facilities to and from the launch pad, too. Altogether, we have about 38-mile industrial short track on Kennedy alone. Using a small fleet of specialized cars and hoppers and existing railways across the US, we can move the large, bulky equipment from the Southwest to Florida’s Space Coast. With all the motor segments complete in January, the last booster motor segment (pictured above) was moved to storage in Utah. Soon, trains will deliver all 10 segments to Kennedy to be stacked with the booster forward and aft skirts and prepared for flight.
A regular passenger airplane doesn’t have the capacity to carry the specialized hardware for SLS and our Orion spacecraft. Equipped with a unique hinged nose that can open more than 200 degrees, our Super Guppy airplane is specially designed to carry the hulking hardware, like the Orion stage adapter, to the Cape. That hinged nose means cargo is actually loaded from the front, not the back, of the airplane. The Orion stage adapter, delivered to Kennedy in 2018, joins to the rocket’s interim cryogenic propulsion stage, which will give our spacecraft the push it needs to go to the Moon on Artemis 1. It fit perfectly inside the Guppy’s cargo compartment, which is 25 feet tall and 25 feet wide and 111 feet long.
In the end, all roads lead to Kennedy, and the star of the transportation show is really the “crawler.” Rolling along at a delicate 1 MPH when it’s loaded with the mobile launcher, our two crawler-transporters are vital in bringing the fully assembled rocket to the launchpad for each Artemis mission. Each the size of a baseball field and powered by locomotive and large power generator engines, one crawler-transporter is able to carry 18 million pounds on the nine-mile journey to the launchpad. As of June 27, 2019, the mobile launcher atop crawler-transporter 2 made a successful final test roll to the launchpad, clearing the transporter and mobile launcher ready to carry SLS and Orion to the launchpad for Artemis 1.
It takes a lot of team work to launch Artemis 1. We are partnering with Boeing, Northrop Grumman and Aerojet Rocketdyne to produce the complex structures of the rocket. Every one of our centers and more than 1,200 companies across the United States support the development of the rocket that will launch Artemis 1 to the Moon and, ultimately, to Mars. From supplying key tools to accelerate the development of the core stage to aiding the transportation of the rocket closer to the launchpad, companies like Futuramic in Michigan and Major Tool & Machine in Indiana, are playing a vital role in returning American astronauts to the Moon. This time, to stay. To stay up to date with the latest SLS progress, click here.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com.
Our Space Launch System isn’t your average rocket. It is the only rocket that can send our Orion spacecraft, astronauts and supplies to the Moon. To accomplish this mega-feat, it has to be the most powerful rocket ever built. SLS has already marked a series of milestones moving it closer to its first launch, Artemis.
Here are four highlights you need to know about — plus one more just on the horizon.
Earlier this month, Boeing technicians at our Michoud Assembly Facility in New Orleans successfully joined the top part to the core stage with the liquid hydrogen tank. The core stage will provide the most of the power to launch Artemis 1. Our 212-foot-tall core stage, the largest the we have ever built, has five major structural parts. With the addition of the liquid hydrogen tank to the forward join, four of the five parts have been bolted together. Technicians are finishing up the final part — the complex engine section — and plan to bolt it in place later this summer.
This August, to be exact. That’s when the engines for Artemis 1 will be added to the core stage. Earlier this year, all the engines for the first four SLS flights were updated with controllers, tested and officially cleared “go” for launch. We’ve saved time and money by modifying 16 RS-25 engines from the space shuttle and creating a more powerful version of the solid rocket boosters that launched the shuttle. In April, the last engine from the shuttle program finished up a four-year test series that included 32 tests at our Stennis Space Center near Bay St. Louis, Mississippi. These acceptance tests proved the engines could operate at a higher thrust level necessary for deep space travel and that new, modernized flight controllers —the “brains” of the engine — are ready to send astronauts to the Moon in 2024.
Our industry partners have completed the manufacture and checkout of 10 motor segments that will power two of the largest propellant boosters ever built. Just like the engines, these boosters are designed to be fast and powerful. Each booster burns six tons of propellant every second, generating a max thrust of 3.6 million pounds for two minutes of pure awesome. The boosters will finish assembly at our Kennedy Space Center in Florida and readied for the rocket’s first launch in 2020. In the meantime, we are well underway in completing the boosters for SLS and Orion’s second flight in 2022.
Meanwhile, other parts of the rocket are finished and ready for the ride to the Moon. The final piece of the upper part of the rocket, the launch vehicle stage adapter, will soon head toward Kennedy Space Center in Florida. Two other pieces, including the interim cryogenic propulsion stage that will provide the power in space to send Orion on to the Moon, have already been delivered to Kennedy.
Our engineers evaluated thousands of designs before selecting the current SLS rocket design. Now, they are performing critical testing and using lessons learned from current assembly to ensure the initial and future designs are up to the tasks of launching exploration missions for years to come. This real-time evaluation means engineers and technicians are already cutting down on assembly time for future mission hardware, so that we and our partners can stay on target to return humans to the Moon by 2024 — to stay so we can travel on to Mars.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com.
Ariana Grande got some space at N-A-S-A. Get yours too.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com.
Whether or not you caught the SpaceX Crew Dragon launch this past weekend, here’s your chance to learn why this mission, known as Demo-1, is such a big deal.
Demo-1 is the first flight test of an American spacecraft designed for humans built and operated by a commercial company.
The SpaceX Crew Dragon lifted off at 2:49 a.m. EST Saturday, March 2, on the company’s Falcon 9 rocket from Kennedy Space Center.
This was the first time in history a commercially-built American crew spacecraft and rocket launched from American soil.
Upon seeing the arriving spacecraft, NASA astronaut Anne McClain snapped a photo from the International Space Station: “Welcome to a new era in human spaceflight.”
After making 18 orbits of Earth, the Crew Dragon spacecraft successfully attached to the International Space Station’s Harmony module at 5:51 a.m. EST Sunday, March 3. The Crew Dragon used the station’s new international docking adapter for the first time since astronauts installed it in August 2016.
The docking phase, in addition to the return and recovery of Crew Dragon, are critical to understanding the system’s ability to support crew flights.
After opening the hatch between the two spacecraft, the crewmates configured Crew Dragon for its stay.
They installed a ventilation system that cycles air from Crew Dragon to the station, installed window covers and checked valves. After that, the crew was all set for a welcoming ceremony for the visiting vehicle.
Although the test is uncrewed, that doesn’t mean the Crew Dragon is empty. Along for the ride was Ripley, a lifelike test device outfitted with sensors to provide data about potential effects on future astronauts. (There is also a plush Earth doll included inside that can float in the microgravity!)
For future operational missions, Crew Dragon will be able to launch as many as four crew members and carry more than 220 pounds of cargo. This will increase the number of astronauts who are able to live onboard the station, which will create more time for research in the unique microgravity environment.
Since the arrival of SpaceX Crew Dragon, the three Expedition 58 crew members have returned to normal operations (with some new additions to the team!)
The Crew Dragon is designed to stay docked to station for up to 210 days, although the spacecraft used for this flight test will remain docked to the space station for only five days, departing Friday, March 8. (We will be providing live coverage — don’t miss it!)
Elon Musk, CEO and lead designer at SpaceX, expressed appreciation for NASA’s support: “SpaceX would not be here without NASA, without the incredible work that was done before SpaceX even started and without the support after SpaceX did start.”
NASA and SpaceX will use data from Demo-1 to further prepare for Demo-2, the crewed flight test that will carry NASA astronauts and Doug Hurley and Bob Behnken to the International Space Station. NASA will validate the performance of SpaceX’s systems before putting crew on board for the Demo-2 flight, currently targeted for July 2019.
Demo-1 is a big deal because it demonstrates NASA and commercial companies working together to advance future space exploration! With Demo-1’s success, NASA and SpaceX will begin to prepare to safely fly astronauts to the orbital laboratory.
Follow along with mission updates with the Space Station blog.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com
It’s World Photography Day!
To celebrate the occasion, we’re sharing photos from our photographers that chronicle what's making news across the agency - from launches and landings to important science announcements to images taken from the vantage point of space.
Take a look!
Posted to Twitter by European Space Agency astronaut Alexander Gerst, this image shows our planet's Moon as seen from the International Space Station. As he said in the tweet, "By orbiting the Earth almost 16 times per day, the #ISS crew travel the distance to the Moon and back – every day. #Horizons"
The International Space Station is the world's only orbital laboratory. An international partnership of space agencies provides and operates the elements of the station. The principals are the space agencies of the United States, Russia, Europe, Japan and Canada.
Photo Credit: NASA
NASA astronaut Ricky Arnold took this selfie during the May 16, 2018, spacewalk to perform upgrades on the International Space Station, saying in a tweet "An amazing view of our one and only planet."
Arnold and fellow spacewalker Drew Feustel donned spacesuits and worked for more than six hours outside the station to finish upgrading cooling system hardware and install new and updated communications equipment for future dockings of commercial crew spacecraft.
Photo Credit: NASA
The mobile service tower at Space Launch Complex-3 is rolled back to reveal the United Launch Alliance Atlas-V rocket with NASA’s InSight spacecraft onboard, Friday, May 4, 2018, at Vandenberg Air Force Base in California. InSight, short for Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, is a Mars lander designed to study the "inner space" of Mars: its crust, mantle, and core.
Photo Credit: NASA/Bill Ingalls
The United Launch Alliance Delta IV Heavy rocket is seen in this long exposure photograph as it launches NASA's Parker Solar Probe to touch the Sun, Sunday, Aug. 12, 2018 from Launch Complex 37 at Cape Canaveral Air Force Station, Florida. Parker Solar Probe is humanity’s first-ever mission into a part of the Sun’s atmosphere called the corona. Here it will directly explore solar processes that are key to understanding and forecasting space weather events that can impact life on Earth.
Photo Credit: NASA/Bill Ingalls
Expedition 56 flight engineer Serena Auñón-Chancellor of NASA waves farewell to family and friends as she and Soyuz Commander Sergey Prokopyev of Roscosmos and flight engineer Alexander Gerst of European Space Agency depart Building 254 for the launch pad a few hours before their launch, Wednesday, June 6, 2018 at the Baikonur Cosmodrome in Kazakhstan. Auñón-Chancellor, Prokopyev, and Gerst launched aboard the Soyuz MS-09 spacecraft at 7:12am EDT (5:12pm Baikonur time) on June 6 to begin their journey to the International Space Station.
Photo Credit: NASA/Victor Zelentsov
The Soyuz MS-09 rocket is launched with Expedition 56 Soyuz Commander Sergey Prokopyev of Roscosmos, flight engineer Serena Auñón-Chancellor of NASA, and flight engineer Alexander Gerst of ESA (European Space Agency), Wednesday, June 6, 2018 at the Baikonur Cosmodrome in Kazakhstan. Prokopyev, Auñón-Chancellor, and Gerst will spend the next six months living and working aboard the International Space Station.
Photo Credit: NASA/Joel Kowsky
In an effort to improve fuel efficiency, NASA and the aircraft industry are rethinking aircraft design. Inside the 8’ x 6’ wind tunnel at NASA Glenn Research Center, engineers tested a fan and inlet design, commonly called a propulsor, which could use four to eight percent less fuel than today’s advanced aircraft.
Photo Credit: NASA/Rami Daud
SOFIA, the Stratospheric Observatory for Infrared Astronomy, is the largest airborne observatory in the world, capable of making observations that are impossible for even the largest and highest ground-based telescopes. During its lifetime, SOFIA also will inspire the development of new scientific instrumentation and foster the education of young scientists and engineers.
Photo Credit: NASA/SOFIA/Waynne Williams
A close-up view of crystals that developed on materials exposed to conditions on Venus in NASA Glenn’s Extreme Environments Rig. This unique and world class ground-based test rig can accurately most simulate atmospheric conditions for any planet or moon in the solar system and beyond.
Photo Credit: NASA/Bridget Caswell
A close-up view of 3-D printed honeycomb patterns made in NASA Glenn manufacturing lab using a method called binder jetting. The honeycomb structures can find use in several applications such as a strong core for lightweight sandwich panels, acoustic panels for noise attenuation and innovative cellular structures.
Photo Credit: NASA/Marvin Smith
To see even more photos of our space exploration efforts, visit us on Flickr: https://www.flickr.com/photos/nasahqphoto/.
Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com.